Sign in
3YRSShenzhen Green Lighting Technology Co., Ltd.

Panoramica aziendale

Album aziendale

Informazioni di base

Capacità di prodotto

Flusso di produzione

Production line
We have three prodcution lines for mining cap lamps production. Our annual production is over 100 thousands cap lamps and 200KM strip lights and about 50 thousands other products.

Apparecchiature di produzione

Nome
No
Quantità
Verificato
Injection machine
HJZK30T
12
CNC machine
CN80
2
Milling machine
ABN-30
1
Lathe machine
A-206
1
Eletrical discharging machine
ZC2SN37
1
Silicon injection mahine
T-300
3
Verificato

Informazioni di fabbrica

Dimensione della fabbrica
1,000-3,000 square meters
Posizione della fabbrica
2nd Floor, No79, Long Sheng Road, Bao Long Community, Long Gang District, Shen Zhen City
N. di linee di produzione
6
Contratto d'opera
OEM Service Offered, Design Service Offered, Buyer Label Offered
Valore della produzione annua
US$10 Million - US$50 Million

La Capacità di Produzione annuale

Nome del prodotto
Unità di Prodotto
HighestEver
UnitType
Verificato
Mining cap lamp
80000
100000
Piece/Pieces
Mining strip light
150000
2000000
Kilometer/Kilometers
Verificato

Linea di produzione

Linea di produzione
Supervisore
NO. di Operatori
NO. di In-linea di CONTROLLO di QUALITÀ/QA
Verificato
Assembly line
6
50
3
Quality inspection line
2
10
2
Packing line
2
10
2
Repairing line
1
5
1
Verificato

Controllo di qualità

Processo di Gestione della qualità

Electrical testing
All the pcb needs to be tested before mass production.
Integrating sphere testing
All the lamps use high-lumen LEDs. Before choosing an LED, we usually test the lumen value of the LED.
Water-proof testing
The lamps are professional lighting. They are with high performance and water-proof grade. Water-proof testing is one important testing.
HIgh and low temperature testing
As these professional lighting lamps, the application enviroment is special. High and low temperature reliability is the required testing.
Salt spray testing
These lamps are used in the environment with complex chemical composition. We usually do 72hrs salt spray testing for the stainless steel parts.